Monday, August 24, 2020

Fully enclosed, working on insulation

All windows and doors are now installed with the exception of 3 custom triangle windows on the South side (on order, awaiting arrival).  Our bedroom is hung with insulation and sheetrock will be starting soon.  It won't be long before we can move into the bedroom area!!